×

Tunnels Velenje


Project type
Cut and cover tunnel
Location
Velenje, Slovenia
Status
Planned
Length
1.120 m (entry/exit caisson, 500 m long first cut-and-cover tunnel, intermediate caisson, 150 m long second cut-and-cover tunnel, entry/exit caisson)
Construction
Cut & cover construction
Client
DARS d.d.