Overpass Lipa-Štore

The overpass Lipa in Štore crosses two roads, double track railway, steel mill facilities with four railway tracks, stream pipeline and river Voglajna. The supports are placed in-between, resulting varying span lengths. Another special feature is the transition from the incremental launching construction method to cast in situ at the end.

A 218 meters long overpass was completed in 2008.

Project type
Road overpass over railway
Location
Štore, Slovenia
Status
Completed
Length
218 meters
Max. span
29 meters
Structure
Continuous pre-stressed concrete structure
Construction
Incremental launching construction method
Client
Public Agency of the Republic of Slovenia for Railway Transport