Overpass Lipa-Štore
The overpass Lipa in Štore crosses two roads, double track railway, steel mill facilities with four railway tracks, stream pipeline and river Voglajna. The supports are placed in-between, resulting varying span lengths. Another special feature is the transition from the incremental launching construction method to cast in situ at the end.
A 218 meters long overpass was completed in 2008.
Project type
Road overpass over railway
Structure
Continuous pre-stressed concrete structure
Construction
Incremental launching construction method
Client
Public Agency of the Republic of Slovenia for Railway Transport