Project type
Road, pedestrian and cyclist bridge
Status
Construction contract signed at the end of 2024, start of construction in early 2025
Ponting Services
Conceptual design / Final design / Detailed design
Structure
Main span: steel arch structure, side spans: concrete slab
Construction
Prefabricated steel structure, cast in situ concrete
Client
Slovenian Water Agency