Ponting came second in the ˝Neue Donaubrücke Linz - Realisierungswettbewerb˝ design competition. Together with Öhlinger + Partner ZT und Zeininger Architekten, both from Austria, Ponting formed a design team of experts to participate at the design competition, attended by only 8 teams of most known european bridge designers, who all had to pass a demanding prequalification round. Our solution of a arch-strengthen continuous beam bridge came second in a very tight final round.
Project details:
˝Neue Donaubrücke Linz˝ Bridge