×
14.09.2018

Footbridge Tremerje

The main bearing structure of the footbridge Tremerje was successfully assembled on site. The 92 m long structure was placed on two temporary supports in the river bed and both abutments on shores. Curently the steel superstructure is being welded together to reach its full length with the main span of 80 m.

Project details: Footbridge Tremerje